1.非電氣專業(yè)職員不得隨意拆裝重慶升降貨梯電器,以防觸電或誤接。Non electric professional staff shall be free to disassemble the Chongqing elevator goods ladder electrical appliances, in order to prevent electric shock or mistake.
2.需要進(jìn)入重慶升降貨梯工作平臺(tái)下面檢驗(yàn)時(shí),必需吊住升降平臺(tái)工作平臺(tái)。以防升降平臺(tái)臺(tái)溘然下降,造成職員傷亡。Need to enter the Chongqing elevator landing platform below the working platform, the lifting platform must be suspended platform. In order to prevent the lifting platform passed down, causing casualties.
3.非專業(yè)職員不得任意調(diào)整溢流閥,液壓系統(tǒng)中的每個(gè)元件都是在劃定壓力下工作時(shí),任意調(diào)整溢流閥后,可能會(huì)造成液壓系統(tǒng)非正常運(yùn)轉(zhuǎn)。對(duì)人、機(jī)、物都會(huì)有不必要的損傷。Non professional staff shall not be arbitrarily adjusted relief valve, hydraulic system of each component is under the designated pressure work, any adjustment relief valve, the hydraulic system may be caused by abnormal operation. There will be no need for people, machines, and things.
4.卸液壓系統(tǒng)任何部位之前,必需首先卸壓,以免壓力油噴出,工作臺(tái)溘然下滑。Before any part of unloading hydraulic system, must first pressure relief, in order to avoid pressure oil spray, bench passed down.
5.相應(yīng)運(yùn)動(dòng)部件間均加注一些潤(rùn)滑油,延長(zhǎng)軸承使用壽命。The corresponding moving parts are filled with lubricating oil, prolong the service life of the bearing.
6.檢查重慶升降貨梯液壓油的油質(zhì)和油位。升降臺(tái)全程升起。在這位置時(shí),液壓油面應(yīng)高出箱底40-50毫米。重慶升降平臺(tái)液壓機(jī)是否變暗、發(fā)粘或有砂礫等異物,如有發(fā)現(xiàn)應(yīng)及時(shí)更換120#液壓油。Chongqing check cargo lifter hydraulic oil oil and oil. Lift table full rise. In this position, the hydraulic oil level should be higher than the 40-50 mm. Chongqing lifting platform hydraulic press is dark, sticky or gravel and other foreign bodies, such as the discovery should be replaced in a timely manner 120# hydraulic oil.
全國服務(wù)熱線
187-2321-1948聯(lián)系電話
微信掃一掃